Stock Photo - 05/16/1999 __ On a beautiful Florida morning, a crawler transporter moves Space Shuttle Discovery right, nearly hidden behind its external tank and solid rocket boosters from Pad 39B back to the Vehicle Assembly Building VAB at left to repair damage to the external tank´s foam insulation caused by hail. The external tank_solid rocket booster stack for mission STS_93 was moved out of High Bay 1, which awaits Discovery´s arrival with its door open. The necessary repair work could not be performed at the pad due to limited access to the damaged areas. The work is expected to take two to three days, allowing Discovery to roll back to Pad 39B by midweek for launch of mission STS_96, the 94th launch in the Space Shuttle Program. This is only the 13th time since 1981 that a Shuttle has had to roll back from the pad. Liftoff will occur no earlier than May 27. STS_96 is a logistics and resupply mission for the International Space Station, carrying such payloads as a Russian crane, the Strela, a U.S._built crane, the Spacehab Oceaneering Space System Box SHOSS, a logistics items carrier, and STARSHINE, a student_shared experiment

Stock Photo: 05/16/1999 -- On a beautiful Florida morning, a crawler transporter moves Space Shuttle Discovery right, nearly hidden behind its external tank and solid rocket.

Searchable keywords

Choose multiple keywords