Stock Photo - 26 June 2019, Mecklenburg-Western Pomerania, Stolpe: A section of the Eugal natural gas pipeline (European Gas Link Pipeline) is ready to be laid in the Peene Tunnel (intake with drone). The Eugal consists of two strands as far as Weissack in Brandenburg, then it runs in one strand as far as Deutschneudorf on the Czech border. The first of two pipelines through which the Russian natural gas from the Nord Stream 2 Baltic Sea pipeline will be transported inland is scheduled for completion by the end of 2019. GASCADE Gastransport GmbH (Kassel), a company of the chemical group BASF and Gazprom, is responsible for construction and future operation. Photo: Stefan Sauer/dpa-Zentralbild/dpa. - Stolpe/Mecklenburg-Western Pomerania/Germany

Stock Photo: 26 June 2019, Mecklenburg-Western Pomerania, Stolpe: A section of the Eugal natural gas pipeline (European Gas Link Pipeline) is ready to be laid in the Peene.

Searchable keywords

Choose multiple keywords