Stock Photo - 13 February 2020, Hessen, Wiesbaden: An inland waterway vessel passes under the freshly assembled bridge section. To complete the Schiersteiner Bridge (A 643), a 120-metre long and 2,050-tonne bridge section (the third of a total of four bridge sections) will be floated in and assembled. The two halves of the Schiersteiner Bridge connect the Hessian and Rhineland-Palatinate sides of the Rhine. Completion is scheduled for 2021. Photo: Andreas Arnold/dpa. - Wiesbaden/Hessen/Germany

Stock Photo: 13 February 2020, Hessen, Wiesbaden: An inland waterway vessel passes under the freshly assembled bridge section. To complete the Schiersteiner Bridge (A 643).