Stock Photo - 27 February 2020, Brandenburg, Potsdam: After the demolition of the Nuthestrasse bridge over Johannsenstrasse, a car drives up the driveway. The second part of the bridge, which crosses the railway tracks and Friedrich-Engels-Straße, is to be sawn up. The entire bridge structure has to be renewed or replaced because the state road agency had found damage in asphalt and concrete. Photo: Soeren Stache/dpa-Zentralbild/ZB. - Potsdam/Brandenburg/Germany

Stock Photo: 27 February 2020, Brandenburg, Potsdam: After the demolition of the Nuthestrasse bridge over Johannsenstrasse, a car drives up the driveway.

Searchable keywords

Choose multiple keywords