Stock Photo - 05 May 2020, Brandenburg, Rathenow: The vineyard bridge leads in wide arches and slightly rising between the vineyard and the Optikpark over two arms of the Havel river and the pond-like Heller Loch. The steel structure was inaugurated in 2014 after 22 months of construction and was to connect the two sites of the Federal Horticultural Show 2015. In 2016, the engineering office schlaich bergermann partner was awarded the German Civil Engineering Prize 2016 for this project Photo: Soeren Stache/dpa-Zentralbild/ZB. - Rathenow/Brandenburg/Germany

Stock Photo: 05 May 2020, Brandenburg, Rathenow: The vineyard bridge leads in wide arches and slightly rising between the vineyard and the Optikpark over two arms of the.

Searchable keywords

Choose multiple keywords