Stock Photo - 05 November 2020, Mecklenburg-Western Pomerania, Lubmin: The double shut-off valves are installed between the pipe systems of the gas receiving station of the Nord Stream Baltic Sea pipeline. Later, six and a half million cubic meters of natural gas per hour are to be processed here and delivered to downstream pipelines at the right pressure. Originally, the pipeline for natural gas from Russia was scheduled to come on stream at the end of 2019. Almost eight billion euros have already been invested in the pipeline. Currently, 150 of the 2,360-kilometre-long double strand of the German-Russian Nord Stream 2 natural gas pipeline are still missing. Photo: Jens Büttner/dpa-Zentralbild/ZB. - Lubmin/Mecklenburg-Western Pomerania/Germany

Stock Photo: 05 November 2020, Mecklenburg-Western Pomerania, Lubmin: The double shut-off valves are installed between the pipe systems of the gas receiving station of the.

Searchable keywords

  • Six
  • Transport
  • Industry
  • Technology
  • End
  • Port
  • Germany
  • Shipping
  • Energy
  • Station
  • Photo
  • Economy
  • Pipe
  • Long
  • Receiving
  • Pressure
  • Euro
  • Half
  • Stream
  • Hour
  • Rail
  • Authority
  • Pipeline
  • Double
  • Still
  • North
  • Russia
  • Russian Federation
  • International
  • Two
  • Invest
  • Local
  • Right
  • Russian
  • Company
  • Deliver
  • German
  • Schedule
  • System
  • Valve
  • Meter
  • Eight
  • Processed
  • Baltic Sea
  • Missing
  • November
  • Install
  • Later
  • Cubic
  • Per
  • 150
  • Between
  • Already
  • Kilometre
  • Almost
  • Come On
  • Here
  • 1E+6
  • 360
  • 2020
  • 2019
  • Jens
  • Downstream
  • Shut-Off
  • Billion
  • Gas Pipeline
  • Mecklenburg-Western Pomerania
  • Natural Gas
  • Natural Resource
  • Buttner
  • Lubmin
  • Been
  • Dpa
  • Strand
  • Zb
  • Nord Stream
  • Environment
Choose multiple keywords