Stock Photo - 12 August 2019, Hessen, Philippsthal: K+S employee Bernd Schneider, Head of Infrastructure, shows a plan in the Hesse-Thuringia potash district at a depth of about 700 metres showing the new storage facility for saline waste water. Thanks to the new underground storage facility (capacity approx. 400,000 cubic metres), Kassel-based K+S, a potash and salt producer, is now much better equipped to withstand production losses caused by drought. (for dpa: ""K+S pumps salt water underground - permit for new storage facility"") Photo: Uwe Zucchi/dpa. - Philippsthal/Hessen/Germany

Stock Photo: 12 August 2019, Hessen, Philippsthal: K+S employee Bernd Schneider, Head of Infrastructure, shows a plan in the Hesse-Thuringia potash district at a depth of.

Searchable keywords

  • Water
  • New
  • Head
  • Show
  • Germany
  • Hesse
  • Hessen
  • Storage
  • Production
  • Mining
  • Photo
  • Economy
  • Chemistry
  • Showing
  • Employee
  • Loss
  • Plan
  • Salt
  • Drought
  • District
  • Underground
  • Pump
  • Thank
  • Infrastructure
  • German
  • Depth
  • Now
  • Cause
  • Facility
  • Producer
  • Better
  • Much
  • 12
  • Based
  • Cubic
  • Capacity
  • Equip
  • August
  • Saline
  • Ks
  • Metre
  • Salt-Water
  • Wastewater
  • Thuringia
  • Permit
  • 400
  • Uwe
  • Kassel
  • Withstand
  • Potash
  • 2019
  • Philippsthal
  • Approx
  • 700 Metres
  • Zucchi
  • Dpa
  • Bernd Schneider
  • Environment
  • Holstein
  • Meier Weitmar
Choose multiple keywords