Stock Photo - 16 March 2020, Brandenburg, Werneuchen: On the open space on the right side of the picture the solar park ""Weesow-Willmersdorf"" is to be built (aerial photo with a drone). On the same day the construction work for the large-scale project was officially started. Almost 26 kilometers northeast of Berlin near Werneuchen (Barnim) in Brandenburg, EnBW is building the ""Weesow-Willmersdorf"" solar park on an area of 164 hectares with an installed capacity of 187 megawatts. According to its own statements, it is to become Germany's largest solar park without subsidies. With the 180 million kilowatt hours generated annually from this, it is calculated that around 50,000 households can be supplied in an environmentally friendly manner and around 129,000 tonnes of CO2 avoided annually. The entire project is scheduled to be commissioned before the end of 2020. Photo: Patrick Pleul/dpa-Zentralbild/ZB. - Werneuchen/Brandenburg/Germany

Stock Photo: 16 March 2020, Brandenburg, Werneuchen: On the open space on the right side of the picture the solar park ""Weesow-Willmersdorf"" is to be built (aerial photo.

Searchable keywords

  • Park
  • Near
  • Work
  • Picture
  • Start
  • End
  • Building
  • Berlin
  • Germany
  • Northeast
  • Brandenburg
  • Energy
  • Large
  • Solar
  • Photo
  • Economy
  • Electricity
  • Day
  • Project
  • Area
  • Build
  • Supply
  • 50
  • Schedule
  • Patrick
  • Install
  • Capacity
  • Household
  • 26
  • Kilometre
  • Own
  • Around
  • Almost
  • Without
  • Before
  • Become
  • Manner
  • Statement
  • Large-Scale
  • Generated
  • Entire
  • Tonne
  • Avoid
  • Calculated
  • Hermann
  • 1E+6
  • 164
  • 180
  • 129
  • 187
  • Officially
  • Environmentally Friendly
  • Subsidy
  • Murnau
  • Kilowatt-Hour
  • 2020
  • Commissioned
  • Barnim
  • Hectare
  • Annually
  • Megawatt
  • According
  • It’S
  • Enbw
  • Same
  • Aerial View
  • Co2
  • Construction Site
  • Open Space
  • Right Side
  • Werneuchen
  • Willmersdorf
  • Dpa
  • Zb
  • Drone
  • Weesow
Choose multiple keywords