Stock Photo - 19 February 2019, Mecklenburg-Western Pomerania, Schwerin: Building rubble, carpet remnants and some furniture can be found in the empty apartments of the skyscrapers prepared for demolition in the district of Neu Zippendorf. The eleven-storey buildings are 36 metres high and are now being dismantled floor by floor. A total of 23,000 tons of construction waste are expected for the demolition of the two high-rise buildings. Photo: Jens Büttner/dpa-Zentralbild/ZB. - Schwerin/Mecklenburg-Western Pomerania/Germany

Stock Photo: 19 February 2019, Mecklenburg-Western Pomerania, Schwerin: Building rubble, carpet remnants and some furniture can be found in the empty apartments of the.

Searchable keywords

  • Highrise
  • Interior
  • Work
  • Empty
  • Flat
  • Sign
  • History
  • Architecture
  • Building
  • Skyscraper
  • Door
  • Prepared
  • Construction
  • Waste
  • Floor
  • Photo
  • Economy
  • Pipe
  • Rubble
  • Rate
  • Perspective
  • Disc
  • Carpet
  • High
  • Conduit
  • Furniture
  • Storey
  • 11
  • District
  • Housing
  • Dry
  • Hallway
  • Two
  • Being
  • Supply
  • Apartment
  • Company
  • Stopcock
  • Now
  • Outline
  • Vacancy
  • Ton
  • Some
  • Demolition
  • Feature
  • Cooperative
  • February
  • 19
  • Dismantle
  • Without
  • Rent
  • Found
  • Remnant
  • Habitation
  • Expected
  • Pictogram
  • 23
  • Total
  • Riser
  • Neu
  • Dismantling
  • Disassembly
  • 2019
  • Prefabricated Building
  • Jens
  • Lessee
  • German Democratic Republic
  • Mecklenburg-Western Pomerania
  • Escape Route
  • Buttner
  • Dpa
  • Schwerin
  • 36 Metres
  • Zippendorf
  • Zb
  • Wgs
Choose multiple keywords