Stock Photo - 26 March 2019, Brandenburg, Schwedt: A worker uses a cut-off wheel to grind a pipe in the crude oil distillation area of PCK Raffinerie GmbH. In the PCK oil refinery 24 of the 36 plants will be inspected until Easter. During the regular maintenance check these are at a standstill. 3,700 employees from external companies empty, clean and flush pipes and equipment. Then possible anomalies such as cracks are searched for. 115 cranes are assembled. TÌV inspectors inspect the systems at the end. Photo: Patrick Pleul/dpa-Zentralbild/ZB. - Schwedt/Brandenburg/Germany

Stock Photo: 26 March 2019, Brandenburg, Schwedt: A worker uses a cut-off wheel to grind a pipe in the crude oil distillation area of PCK Raffinerie GmbH.

Searchable keywords

Choose multiple keywords