Stock Photo - 29 September 2021, Brandenburg, Küstrin-Kietz: On the German-Polish border river Oder, the old railway bridge between Küstrin-Kietz and Kostrzyn in Poland is currently being dismantled. A new railway bridge will be built on the German-Polish border. The old bridge is currently being dismantled. Before construction began, explosive ordnance experts and archaeologists had examined the area. Due to heavy fighting during the Second World War, the construction site was heavily contaminated with ammunition. According to the design of the bridge planners of the company Schüßler-Plan Berlin, in cooperation with Knights Architects London, a 130-metre network arch bridge will later span the Oder. In addition to this main bridge, there will also be a flyover structure over the Oder forebay. Photo: Patrick Pleul/dpa-Zentralbild/ZB. - Küstrin-Kietz/Brandenburg/Germany

Stock Photo: 29 September 2021, Brandenburg, Küstrin-Kietz: On the German-Polish border river Oder, the old railway bridge between Küstrin-Kietz and Kostrzyn in Poland is.

Searchable keywords

  • 130 Metres
  • 2021
  • 29
  • 29 September 2021
  • According
  • Addition
  • Ammunition
  • Arch
  • Archaeologist
  • Architect
  • Area
  • Arnold A.
  • Before
  • Begin
  • Being
  • Berlin
  • Between
  • Border
  • Brandenburg
  • Bridge
  • Build
  • Company
  • Construction
  • Construction Site
  • Contaminated
  • Cooperation
  • Design
  • Dismantle
  • Dpa
  • Due To
  • Economy
  • Examine
  • Expert
  • Explosive
  • Fight
  • Flyover
  • Forebay
  • German
  • Germany
  • Had
  • Heavily
  • Heavy
  • Knight
  • Kostrzyn
  • Küstrin-Kietz
  • Later
  • London
  • Main
  • Markisch
  • Network
  • New
  • Oder
  • Oderland
  • Old
  • Ordnance
  • Patrick
  • Photo
  • Plan
  • Planner
  • Poland
  • Polish
  • Railway
  • River
  • Schüßler
  • Second World War
  • September
  • Span
  • Structure
  • Traffic
  • Web
  • World War Ii
  • Zb
Choose multiple keywords