Stock Photo - 01/15/2001 ___ In the Orbiter Processing Facility bay 1, STS_102 Pilot James W. Kelly right points to a piece of equipment in Discovery’s payload bay. The crew is at KSC for Crew Equipment Interface Test activities. STS_102 is the 8th construction flight to the International Space Station and will carry the Multi_Purpose Logistics Module Leonardo. STS_102 is scheduled for launch March 1, 2001. On that flight, Leonardo will be filled with equipment and supplies to outfit the U.S. laboratory module Destiny. The mission will also be carrying the Expedition Two crew to the Space Station, replacing the Expedition One crew who will return on Shuttle Discovery

Stock Photo: 01/15/2001 --- In the Orbiter Processing Facility bay 1, STS-102 Pilot James W. Kelly right points to a piece of equipment in Discovery’s payload bay.

Searchable keywords

Choose multiple keywords