Stock Photo - 04/19/2001 __ Spring leaves frame the launch of Space Shuttle Endeavour on mission STS_100, the ninth flight to the International Space Station. Liftoff occurred at 2:40:42 p.m. EDT. The 11_day mission will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Space Station Remote Manipulator System and the UHF Antenna. The mission includes two planned spacewalks for installation of the SSRMS on the Station. Also onboard is the Multi_Purpose Logistics Module Raffaello, carrying resupply stowage racks and resupply/return stowage platform

Stock Photo: 04/19/2001 -- Spring leaves frame the launch of Space Shuttle Endeavour on mission STS-100, the ninth flight to the International Space Station.

Searchable keywords

Choose multiple keywords