Stock Photo - 06/12/1999 __ The S0 truss nears its resting place in the workstand in the O&C Bldg. O&C. The S0 truss will undergo processing in the O&C during which the Canadian Mobile Transporter, power distribution system modules, a heat pipe radiator for cooling, computers, and a pair of rate gyroscopes will be installed. Four Global Positioning System antennas are already installed. A 44by 15_foot structure weighing 30,800 pounds when fully outfitted and ready for launch, the truss will be at the center of the ISS 10_truss, girderlike structure that will ultimately extend the length of a football field. Eventually the S0 truss will be attached to the U.S. Lab, Destiny, which is scheduled to be added to the ISS in April 2000. Later, other trusses will be attached to the S0 on_orbit. The S0 truss is scheduled to be launched in the first quarter of 2001 on mission STS_108

Stock Photo: 06/12/1999 -- The S0 truss nears its resting place in the workstand in the O&C Bldg. O&C. The S0 truss will undergo processing in the O&C during which the.

Searchable keywords

Choose multiple keywords