Stock Photo - 10/31/2000 __ Space Shuttle Endeavour is ready to move from the Vehicle Assembly Building into the light of early morning on its rollout to Launch Pad 39B. The Space Shuttle sits atop the Mobile Launcher Platform MLP. Endeavour is scheduled to be launched Nov. 30 at 10:01 p.m. EST on mission STS_97, the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic PV module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections

Stock Photo: 10/31/2000 -- Space Shuttle Endeavour is ready to move from the Vehicle Assembly Building into the light of early morning on its rollout to Launch Pad 39B.

Searchable keywords

Choose multiple keywords