Foto de stock - 02 March 2021, Mecklenburg-Western Pomerania, Stralsund: Alexander Badrow (CDU), Lord Mayor of Stralsund, stands in the lido at the construction site for the extension of the Sundpromenade on the Strelasund. With mechanical support, a total of 1,106 planks are being pulled out, which had been driven into a length of around 440 metres in 1974. The costs for the first construction phase amount to around 3.2 million euros. Because the Sundpromenade area will be considerably upgraded for tourism as a result of the construction work, around 2.5 million euros will be subsidised by the federal and state governments as part of the joint task of ""improving the regional economic structure"", leaving 700,000 euros for the Hanseatic city itself. Photo: Stefan Sauer/dpa-Zentralbild/ZB. - Stralsund/Mecklenburg-Western Pomerania/Germany

Imagen: 02 March 2021, Mecklenburg-Western Pomerania, Stralsund: Alexander Badrow (CDU), Lord Mayor of Stralsund, stands in the lido at the construction site for the.

Criterios de búsqueda

  • Uno
  • Ocio
  • Trabajo
  • Lifestyles
  • Estado
  • Ciudad
  • Turismo
  • Edificio
  • Gobierno
  • Alemania
  • Colectividad
  • Comunidad
  • Sendero
  • Marchándose
  • Resultado
  • De Pie
  • Foto
  • Economía
  • Euro
  • Excursionismo
  • Apoyo
  • Primero
  • Extensión
  • Being
  • Fuera
  • Tarea
  • Longitud
  • Importe
  • Mecánico
  • Tirado
  • Mar Báltico
  • Establecimiento
  • Alrededor
  • Articulación
  • Fase
  • Federal
  • Tablón
  • Coste
  • Impulsado
  • Regional
  • Total
  • Stralsund
  • Lido
  • 106
  • 1E +6
  • Mejora
  • Actualización
  • 1974
  • Hanseático
  • 700
  • Subsidiar
  • Linke
  • Cdu
  • Baños De Mar
  • Lord Mayor
  • Mecklemburgo-Pomerania Occidental
  • Parte
  • Obras
  • 2-5
  • Porque
  • Strelasund
  • 3-2
  • Had
  • Sido
  • Dpa
  • 440 Metros
  • Stefan Sauer
  • Alexander Badrow
  • Janine Wißler
  • Zb
Selecciona varios criterios