Foto de stock - PRODUCTION - 17 November 2021, Hessen, Darmstadt: Trees can also be laid across the track by remote control on the model layout in the Darmstadt railway operations field (EBD) in order to be able to depict unexpected scenarios. In the background, Holger Kötting, technical supervisor of the facility, watches the train slowing down. The simulation facility is intended to realistically reproduce as many different operating situations as possible on the real railway. (to dpa ""Training with toy locomotive - model railway helps with signal box work"") Photo: Frank Rumpenhorst/dpa. - Darmstadt/Hessen/Germany

Imagen: PRODUCTION - 17 November 2021, Hessen, Darmstadt: Trees can also be laid across the track by remote control on the model layout in the Darmstadt railway.

Criterios de búsqueda

Selecciona varios criterios