Photo de stock - Lineman working with a wire rope hoist on a 380-kV long-distance line owned by the 50Hertz transmission system operator, track cables are being pulled from one pylon to the next, these cables will be used later to install the actual electric track cables, linemen sitting on the power poles are taking on the cables, Gudow, Schleswig-Holstein, Germany, Europe

Photo de stock: Lineman working with a wire rope hoist on a 380-kV long-distance line owned by the 50Hertz transmission system operator, track cables are being pulled from one.

Mots-clés utilisés

Choisir des mots clés multiples