Photo de stock - 21 April 2022, Saxony, Pirna: Construction workers follow the breakthrough at the 300-meter-long Kohlberg Tunnel on a construction site. The tunnel is part of the future bypass of the federal highway 172 in Pirna. (Aerial photograph taken with a drone) Photo: Sebastian Kahnert/dpa. - Pirna/Saxony/Germany

Photo de stock: 21 April 2022, Saxony, Pirna: Construction workers follow the breakthrough at the 300-meter-long Kohlberg Tunnel on a construction site.

Mots-clés utilisés

Choisir des mots clés multiples