Photo de stock - 03 May 2021, Brandenburg, Freienbrink: The concrete carriageway on one side of the A10 eastern Berliner Ring motorway is being renewed. Since 01.03.2021, roadway rehabilitation work has been underway on the eastern Berliner Ring south of the Rüdersdorf junction in the direction of the Spreeau motorway interchange. The existing concrete carriageway is being replaced over a length of almost 11 kilometres by a new asphalt carriageway. In addition, repair work will be carried out on the bridge structures in the construction area. The construction work is scheduled for completion by the end of 2021. Photo: Patrick Pleul/dpa-Zentralbild/ZB. - Freienbrink/Brandenburg/Germany

Photo de stock: 03 May 2021, Brandenburg, Freienbrink: The concrete carriageway on one side of the A10 eastern Berliner Ring motorway is being renewed. Since 01.03.

Mots-clés utilisés

Choisir des mots clés multiples