Photo de stock - 16 May 2020, Saxony-Anhalt, ---: Steam locomotives are being prepared for operation at the Harz narrow-gauge railway station. The Harz narrow-gauge railways have steam trains running again after a standstill of more than two months due to corona. From Monday, May 18, at least limited operation will resume on the approximately 140-kilometer long network. Initially, two steam trains were to run daily from Wernigerode to the Brocken, with two further trips starting from Drei Annen Hohne. Photo: Matthias Bein/dpa-Zentralbild/dpa. - ---/Saxony-Anhalt/Germany

Photo de stock: 16 May 2020, Saxony-Anhalt, ---: Steam locomotives are being prepared for operation at the Harz narrow-gauge railway station.

Mots-clés utilisés

Choisir des mots clés multiples