Photo de stock - Construction site of the new hydropower plant in Rheinfelden, shaft 3, positioning the impeller, 6.5 metres in diameter and weighing 40 tons

Photo de stock: Construction site of the new hydropower plant in Rheinfelden, shaft 3, positioning the impeller, 6.5 metres in diameter and weighing 40 tons.

Mots-clés utilisés

Choisir des mots clés multiples