Photo de stock - 02 November 2023, Hamburg: Jens Kerstan (Bündnis 90/Die Grünen), Senator for the Environment, Climate, Energy and Agriculture in Hamburg, stands at the drill shaft after the naming ceremony of the tunnel boring machine ""Hermine"". In accordance with mining custom, the tunnel boring machine for the new district heating tunnel through the Elbe was christened ""Hermine"" in Hamburg-Waltershof. The Elbe tunnel, which is just under 1.2 kilometers long and can be walked through, is intended to connect the Hafen energy park with its combined-cycle gas turbine power plant, which is still under construction, and the industrial waste heat from the port operations with the district heating network on the north bank of the Elbe. By the end of 2025, the aging coal-fired power plant in Wedel will be replaced. Photo: Marcus Brandt/dpa. - Hamburg/Hamburg/Germany

Photo de stock: 02 November 2023, Hamburg: Jens Kerstan (Bündnis 90/Die Grünen), Senator for the Environment, Climate, Energy and Agriculture in Hamburg.

Mots-clés utilisés

Choisir des mots clés multiples