Photo de stock - 16 June 2023, Saxony, Chemnitz: Construction work is underway on the historic railroad viaduct in Chemnitz in front of the striking Wirkbau clock tower in the Art Deco style. Since April 2022, the more than 100-year-old bridge structure over the B95 has been undergoing renovation in line with monument protection requirements. Steel girders of the 275-meter-long bridge are being recoated and need to be reinforced, as do the foundations. Over 10,500 rivets in the arch area of the structure will be replaced. In the course of the expansion of the Sachsen-Franken-Magistrale from Leipzig/Dresden via Werdau to Hof, the bridge, which was built between 1901 and 1909, was originally to be replaced by a reinforced concrete structure. However, the plans met with great protest. Photo: Hendrik Schmidt/dpa. - Chemnitz/Saxony/Germany

Photo de stock: 16 June 2023, Saxony, Chemnitz: Construction work is underway on the historic railroad viaduct in Chemnitz in front of the striking Wirkbau clock tower in the.

Mots-clés utilisés

Choisir des mots clés multiples