Photo de stock - State Secretary for the state of Saxony-Anhalt Jurgen Ude (face covered, left to right), Peter Dold from the Fraunhofer Centre for Silicon Photovoltaics (CSP), the Premier of the state of Saxony-Anhalt, Reiner Haseloff, and Ralf Wehrspon, Director of the Fraunhofer Institute for Materials Microstructure and Systems (IMWS), performing a symbolic ground breaking ceremony for a new photovoltaic facility in the grounds of the Fraunhoger CSP in Halle/Saale, Germany, 25 October 2017. The new facility will consist of 358 photovoltaic modules. The Fraunhofer Centre for Silicon Photovoltaics is also celebrating its 10th anniversary. Photo: Hendrik Schmidt/dpa-Zentralbild/dpa. - Halle (Saale)/Saxony-Anhalt/Germany

Photo de stock: State Secretary for the state of Saxony-Anhalt Jurgen Ude (face covered, left to right), Peter Dold from the Fraunhofer Centre for Silicon Photovoltaics (CSP).

Mots-clés utilisés

Choisir des mots clés multiples