Stock Photo - 01 December 2022, Saxony, Leipzig: A truck drives over the area of the Leipzig-Wahren transhipment station in the early morning. (Shot with long exposure time). The freight terminal went into operation in 2001. In 2017, an expansion with additional tracks and cranes doubled the facility's capacity. Every day, up to a thousand containers can be transferred here between road and rail. Photo: Jan Woitas/dpa. - Leipzig/Saxony/Germany

Stock Photo: 01 December 2022, Saxony, Leipzig: A truck drives over the area of the Leipzig-Wahren transhipment station in the early morning.

Searchable keywords

Choose multiple keywords