Stock Photo - 03 February 2022, Brandenburg, Uebigau-Wahrenbrück/Ot Neudeck;Denkmalschutz;: A bridge about 70 meters long leads over the Schwarze Elster and connects the villages of Neudeck and Kleinrössen in the course of the state road L 673. Built from 1904 to 1905, the structure made of stamped concrete was nominated for the German Bridge Building Award after its renovation in 2020 and received an award in the category ""Road and Rail Bridges"". Photo: Soeren Stache/dpa-Zentralbild/dpa. - Uebigau-Wahrenbrück/Ot Neudeck;Denkmalschutz;/Brandenburg/Germany

Stock Photo: 03 February 2022, Brandenburg, Uebigau-Wahrenbrück/Ot Neudeck;Denkmalschutz;: A bridge about 70 meters long leads over the Schwarze Elster and connects the.

Searchable keywords

Choose multiple keywords