Stock Photo - 05 March 2022, Cologne: The first steel part for the New Bridge of the A1 over the Rhine near Leverkusen is hazed to the concrete girders of the bridge and brought to the right height. The component is 66 meters long, 34 meters wide and weighs 1115 tons (photo with drone). Photo: Henning Kaiser/dpa. - Cologne/Germany

Stock Photo: 05 March 2022, Cologne: The first steel part for the New Bridge of the A1 over the Rhine near Leverkusen is hazed to the concrete girders of the bridge and.

Searchable keywords

Choose multiple keywords