Stock Photo - 05 September 2023, Bremen, Bremerhaven: The LNG terminal vessel Transgas Force is moored in Kaiserhafen Drei at the Lloyd shipyard in Bremerhaven. Built in 2021, the approximately 300-meter-long vessel is a floating storage and regasification unit (FSRU) and is scheduled to be deployed at the LNG terminal in Stade from the end of 2023. Prior to this, adaptation work will be carried out by the Lloyd shipyard. Photo: Focke Strangmann/dpa. - Bremerhaven/Bremen/Germany

Stock Photo: 05 September 2023, Bremen, Bremerhaven: The LNG terminal vessel Transgas Force is moored in Kaiserhafen Drei at the Lloyd shipyard in Bremerhaven.

Searchable keywords

Choose multiple keywords