Stock Photo - 09 December 2019, Saxony-Anhalt, Wolmirstedt: A wind turbine rotates at the Wolmirstedt transformer station. From here, a 580-kilometer long power line from Saxony-Anhalt to Bavaria, the so-called Southeast Link, is to be built. The project is planned by the company 50Hertz. Photo: Stephan Schulz/dpa-Zentralbild/ZB. - Wolmirstedt/Saxony-Anhalt/Germany

Stock Photo: 09 December 2019, Saxony-Anhalt, Wolmirstedt: A wind turbine rotates at the Wolmirstedt transformer station. From here, a 580-kilometer long power line from.

Searchable keywords

Choose multiple keywords