Stock Photo - 09 September 2020, Brandenburg, Grünheide: Concrete pillars and first exterior walls for the paint shop can be seen on the Tesla Gigafactory construction site. On the same day there was a tour for journalists through the construction site east of Berlin. From July 2021, a maximum of 500,000 vehicles per year are to roll off the assembly line at the factory - and according to the carmaker's plans, the maximum should be reached as quickly as possible. The US electric car manufacturer expects up to 10,500 employees working shifts for its planned first factory in Europe. Photo: Patrick Pleul/dpa-Zentralbild/dpa. - Grünheide/Brandenburg/Germany

Stock Photo: 09 September 2020, Brandenburg, Grünheide: Concrete pillars and first exterior walls for the paint shop can be seen on the Tesla Gigafactory construction site.

Searchable keywords

Choose multiple keywords