Stock Photo - 10 February 2023, Brandenburg, Potsdam: During the ""Construction Site Open Day"", the 33-meter-high drilling tower can be seen at the construction site for deep geothermal energy. Since mid-December 2022, drilling has been underway at Heinrich-Mann-Allee on behalf of Stadtwerke Potsdam's Energie und Wasser GmbH. On the same day, residents of Potsdam were able to find out about the current status of the work at the open construction site day. Around 2000 meters are to be drilled into the depths here. The natural geothermal heat for is to be used later for the heat supply. Photo: Patrick Pleul/dpa/ZB. - Potsdam/Brandenburg/Germany

Stock Photo: 10 February 2023, Brandenburg, Potsdam: During the ""Construction Site Open Day"", the 33-meter-high drilling tower can be seen at the construction site for.

Searchable keywords

Choose multiple keywords