Stock Photo - 11 July 2019, Berlin: From a ship, workers control the underside of the Elsen Bridge. In the summer of 2018, considerable damage was found to the structure, so that the bridge will be demolished and probably rebuilt by 2028. Part of the bridge has been closed to traffic since 2018. Photo: Paul Zinken/dpa. - Berlin/Berlin/Germany

Stock Photo: 11 July 2019, Berlin: From a ship, workers control the underside of the Elsen Bridge. In the summer of 2018, considerable damage was found to the structure.

Searchable keywords

  • Summer
  • Water
  • Control
  • Traffic
  • Building
  • Berlin
  • Germany
  • Worker
  • Photo
  • Economy
  • Closed
  • Damage
  • Bridge
  • Paul
  • Development
  • Ship
  • Underside
  • Demolish
  • Found
  • Rebuilt
  • Probably
  • Spree
  • Workman
  • Since
  • 2018
  • 2028
  • Elsen
  • Part Of
  • Been
  • Zinken
  • Dpa
  • Has
  • Dirk Orlishausen
  • Korbinian Vollmann
  • Nico Rieble
  • Kai Bülow
  • Mirnes Pepić
  • Nico Neidhart
  • Maximilian Ahlschwede
  • Julian Riedel
  • Merveille Biankadi
  • Marco Königs
  • Jens Härtel
  • Ronny Thielemann
  • Markus Kolke
  • Jonas Hildebrandt
  • Max Reinthaler
  • Tanju Öztürk
  • Uwe Ehlers
  • Alexander Sebald
  • Adam Straith
  • Aaron Opoku
  • Köbi Kuhn
  • Nils Butzen
  • Pascal Breier
  • Erik Engelhardt
  • Frederik Lach
  • Sven Sonnenberg
  • Elsamed Ramaj
  • Paul Wiese
Choose multiple keywords