Stock Photo - 16 May 2019, Mecklenburg-Western Pomerania, Wrangelsburg: Activists have occupied a pipe on the Eugal line at the construction site. According to police, several people have crawled into already laid pipes with a diameter of 1.40 meters, which are laid at this point over a distance of 1.5 kilometers. With the action under the slogan ?north Stream 2 block! the activists want to delay the construction according to own data and make attentive to climatic damage by natural gas. The Eugal gas pipeline is to run 485 kilometers from Lublin near Greifswald to the Czech border - largely parallel to the existing Opal pipeline. It is intended to ensure the onward transport of natural gas from the controversial Nord Stream 2 Baltic Sea pipeline. The project is being built and operated by a subsidiary of BASF and the Russian Gazprom Group. The costs are estimated at three billion euros. Photo: Stefan Sauer/dpa-Zentralbild/dpa. - Wrangelsburg/Mecklenburg-Western Pomerania/Germany

Stock Photo: 16 May 2019, Mecklenburg-Western Pomerania, Wrangelsburg: Activists have occupied a pipe on the Eugal line at the construction site.

Searchable keywords

Choose multiple keywords