Stock Photo - 17 January 2019, Brandenburg, Kienbaum: The construction site of the European Gas Link Pipeline (EUGAL) (aerial view with a drone). The gas route of the gas network operator Gascade is to be almost 500 kilometres long and from the end of 2019 will primarily transport Russian natural gas from the Baltic Sea through the federal states of Mecklenburg-Western Pomerania, Brandenburg and Saxony to the Czech Republic. Brandenburg accounts for the largest section with about 270 kilometers. Each individual pipe is about 18 meters long, weighs about 15 tons and has a diameter of 1.40 meters. Photo: Patrick Pleul/dpa-Zentralbild/ZB. - Kienbaum/Brandenburg/Germany