Stock Photo - 19 September 2022, Mecklenburg-Western Pomerania, Lubmin: Robert Habeck (Bündnis 90/Die Grünen), Federal Minister for Economic Affairs and Climate Protection, and Manuela Schwesig (SPD), Minister President of Mecklenburg-Western Pomerania, visit a planned injection point at the Lubmin energy site, on the premises of the company Gascade Gastransport GmbH. Liquefied gas is to be landed in the industrial port and piped via the Gascade Gastransport GmbH site to the transfer station of the OPAL (Ostsee-Pipeline-Anbindungsleitung - Baltic Sea Pipeline Link) and NEL (Nordeuropäische Erdgasleitung - North European Gas Pipeline) long-distance gas pipelines. Until deliveries were stopped more than two weeks ago, Russian natural gas arrived here via the Nord Stream 1 Baltic Sea pipeline. The Nord Stream 2 pipeline, which never went into operation, also ends here. Photo: Stefan Sauer/dpa. - Lubmin/Mecklenburg-Western Pomerania/Germany

Stock Photo: 19 September 2022, Mecklenburg-Western Pomerania, Lubmin: Robert Habeck (Bündnis 90/Die Grünen), Federal Minister for Economic Affairs and Climate Protection.

Searchable keywords

Choose multiple keywords