Stock Photo - 22 June 2021, Mecklenburg-Western Pomerania, Koserow: Workers install a railing on the new pier in the Baltic resort of Koserow on the island of Usedom.The structure, which extends some 280 metres into the sea and includes a pier, ramp and platform, was built on 67 foundation piles.The new pier cost a total of just under 7.4 million euros, with around 4.9 million euros coming from the Ministry of Economic Affairs.In addition, an eight-meter high bell tower was installed on the head of the pier, as well as a seating and sunbathing area.the pier will be temporarily opened to visitors at the end of June, before the remaining work is scheduled to begin in mid-September. Photo: Stefan Sauer/dpa. - Koserow/Mecklenburg-Western Pomerania/Germany

Stock Photo: 22 June 2021, Mecklenburg-Western Pomerania, Koserow: Workers install a railing on the new pier in the Baltic resort of Koserow on the island of Usedom.

Searchable keywords

  • Sea
  • Water
  • Beach
  • Leisure
  • Sunbathing
  • 4
  • Pile
  • New
  • Under
  • Work
  • Lifestyle
  • Head
  • Island
  • Begin
  • Coming
  • End
  • Tourism
  • Building
  • Germany
  • Worker
  • Photo
  • Economy
  • Open
  • Extend
  • Euro
  • Affair
  • Bridge
  • Railing
  • High
  • Seven
  • Visitor
  • Area
  • Build
  • Just
  • Pier
  • Seating
  • Resort
  • Schedule
  • Belltower
  • Mid
  • September
  • Eight
  • Baltic Sea
  • June
  • Remaining
  • Install
  • Include
  • Some
  • Ramp
  • Usedom
  • Around
  • Before
  • Addition
  • Cost
  • Metre
  • Total
  • Ministry
  • Temporarily
  • 1E+6
  • 67
  • Mecklenburg-Western Pomerania
  • Construction Site
  • 4-9
  • Koserow
  • Dpa
  • 280 Metres
  • Foundations
  • Stefan Sauer
  • Platform
  • Torsten Renz
  • Stefan Sternberg
Choose multiple keywords