Stock Photo - 23 August 2023, Lower Saxony, Stade: Dredgers unload bran from a transport ship at the Kleilager near the construction site of the LNG terminal on the Elbe in Stade. The liquefied gases jetty is scheduled for completion in winter 2023/24. Photo: Focke Strangmann/dpa. - Stade/Lower Saxony/Germany

Stock Photo: 23 August 2023, Lower Saxony, Stade: Dredgers unload bran from a transport ship at the Kleilager near the construction site of the LNG terminal on the Elbe in.

Searchable keywords

Choose multiple keywords