Stock Photo - 23 October 2023, Saxony, Leipzig: Pressure gauges are installed on district heating pipes in the pump hall for district heating in the new combined heat and power plant South. On the same day, Germany's first certified hydrogen power plant went into operation. The two gas turbines, each with an electrical output of 62.5 megawatts, are suitable for burning hydrogen. A 60-meter-high hot water storage tank with 43,000 cubic meters of water and solar collectors for hot water production are to guarantee the city's Co2-free supply security. Photo: Jan Woitas/dpa. - Leipzig/Saxony/Germany

Stock Photo: 23 October 2023, Saxony, Leipzig: Pressure gauges are installed on district heating pipes in the pump hall for district heating in the new combined heat and.

Searchable keywords

Choose multiple keywords