Stock Photo - 27 July 2022, Saxony-Anhalt, Magdeburg: A worker stands on a wooden bridge that has been mounted between the pylons of the replacement power bridge train. Cladding tubes lead down from the pylons. Each tube of the bridge contains several steel cables that support the bridge. In the past few weeks, the first cladding tubes were mounted on the pylons and the steel cables are currently being pulled into them. In the end, the bridge is to have a total of 28 of these cladding tubes. 14 steel cables on each pylon and seven on each side of the pylon. Photo: Klaus-Dietmar Gabbert/dpa. - Magdeburg/Saxony-Anhalt/Germany

Stock Photo: 27 July 2022, Saxony-Anhalt, Magdeburg: A worker stands on a wooden bridge that has been mounted between the pylons of the replacement power bridge train.

Searchable keywords

Choose multiple keywords