Stock Photo - 27 July 2022, Saxony-Anhalt, Magdeburg: Cladding tubes lead from the pylons of the replacement power bridge train to the ground. Each tube of the bridge contains several steel cables that support the bridge. In the past few weeks, the first cladding tubes were installed on the pylons, into which the steel cables are currently being pulled. In the end, the bridge is to have a total of 28 of these cladding tubes. 14 steel cables on each pylon and seven on each side of the pylon. Photo: Klaus-Dietmar Gabbert/dpa. - Magdeburg/Saxony-Anhalt/Germany

Stock Photo: 27 July 2022, Saxony-Anhalt, Magdeburg: Cladding tubes lead from the pylons of the replacement power bridge train to the ground.

Searchable keywords

Choose multiple keywords