Stock Photo - 28 March 2021, North Rhine-Westphalia, Lünen: During the first of two blasts, the 250-metre-high chimney of the former Steag power plant collapses. The former Steag power plant is blown up. It will take a total of 420 kilograms and 2,100 drillings to level the 110-meter-high cooling tower, the 250-meter chimney and the boiler house with its nearly 70 meters to the ground. Preparations have been underway since December. Photo: Guido Kirchner/dpa. - Lünen/North Rhine-Westphalia/Germany

Stock Photo: 28 March 2021, North Rhine-Westphalia, Lünen: During the first of two blasts, the 250-metre-high chimney of the former Steag power plant collapses.

Searchable keywords

Choose multiple keywords