Stock Photo - dpatop - 05 October 2019, Baden-Wuerttemberg, Vaihingen an der Enz: The ruins of the Egelseebrücke bridge lie in the Enz after a controlled blasting. The bridge from 1948 has only been passable on one lane for years - a new structure is therefore to be built on the same site. The new building will start in mid-November and is expected to last until mid-2021. Photo: Christoph Schmidt/dpa. - Vaihingen an der Enz/Baden-Wuerttemberg/Germany

Stock Photo: dpatop - 05 October 2019, Baden-Wuerttemberg, Vaihingen an der Enz: The ruins of the Egelseebrücke bridge lie in the Enz after a controlled blasting.

Searchable keywords

Choose multiple keywords