Stock Photo - PRODUCTION - 01 December 2022, Mecklenburg-Western Pomerania, Rerik: A bulldozer spreads sand on the Baltic Sea beach while a walker watches the work. The flushing work on the storm surge protection dune near Rerik (Rostock district), which began at the end of October, will be completed on 02.12.2022. About 160,000 cubic meters of sand were flushed up over a length of 1300 meters. Photo: Bernd Wüstneck/dpa. - Rerik/Mecklenburg-Western Pomerania/Germany

Stock Photo: PRODUCTION - 01 December 2022, Mecklenburg-Western Pomerania, Rerik: A bulldozer spreads sand on the Baltic Sea beach while a walker watches the work.

Searchable keywords

Choose multiple keywords