Stock Photo - PRODUCTION - 03 May 2023, Schleswig-Holstein, Klixbüll: A fitter operates the drum with the leader rope between the power poles of the last construction section of the west coast line. Lightweight plastic ropes are flown from pole to pole by helicopter, while industrial fitters guide the leader rope through pulleys at the ends of the poles. The west coast line - a 380-kilovolt overhead line - will run for a total of around 140 kilometers between Brunsbüttel and the Danish border and on from there. Photo: Christian Charisius/dpa. - Klixbüll/Schleswig-Holstein/Germany

Stock Photo: PRODUCTION - 03 May 2023, Schleswig-Holstein, Klixbüll: A fitter operates the drum with the leader rope between the power poles of the last construction section.

Searchable keywords

Choose multiple keywords