Stock Photo - PRODUCTION - 03 May 2023, Schleswig-Holstein, Klixbüll: A helicopter flies between the power pylons of the final construction section of the West Coast Pipeline as the so-called leader cables are being pulled in. The helicopter is used to fly lightweight plastic cables from pole to pole, while industrial fitters guide the leader cable through pulleys at the ends of the poles. The west coast line - a 380-kilovolt overhead line - will run for a total of around 140 kilometers between Brunsbüttel and the Danish border and on from there. Photo: Christian Charisius/dpa. - Klixbüll/Schleswig-Holstein/Germany

Stock Photo: PRODUCTION - 03 May 2023, Schleswig-Holstein, Klixbüll: A helicopter flies between the power pylons of the final construction section of the West Coast Pipeline.

Searchable keywords

Choose multiple keywords