Stock Photo - Project leader Andrea Lussu walking thorugh a section of construction site for the Brenner Base Tunnel (Brenner Basistunnel, BBT) near Innsbruck, Austria, 18 August 2017. The planned 64-kilometre railway tunnel between Austria and Italy is scheduled for completion in 2026. Photo: Peter Kneffel/dpa. - Innsbruck/South Tirol/Austria

Stock Photo: Project leader Andrea Lussu walking thorugh a section of construction site for the Brenner Base Tunnel (Brenner Basistunnel, BBT) near Innsbruck, Austria.

Searchable keywords

Choose multiple keywords