Stock Photo - Turbine assembly workers at the First Brno Engineering Plant ZKG-Brno started assembly of the 31st 6 megawatt gas turbine for the USSR. They have thus entered the second third of the deliveries of the total number of these turbines destined for the USSR. The types of these machines will be very identical to those that the plant will produce for the transit pipeline that will run through the territory of the USSR. Jiri Kocian unwinding the stator blades of a compressor for a gas turbine. (CTK Photo/Frantisek Nesvadba)

Stock Photo: Turbine assembly workers at the First Brno Engineering Plant ZKG-Brno started assembly of the 31st 6 megawatt gas turbine for the USSR.

Searchable keywords

Choose multiple keywords