Stock Photo - 10/06/1997 __ The orbiter drag chute deploys after the Space Shuttle orbiter Atlantis lands on Runway 15 of the KSC Shuttle Landing Facility SLF at the conclusion of the nearly 11_day STS_86 mission. Main gear touchdown was at 5:55:09 p.m. EDT, Oct. 6, 1997, with an unofficial mission_elapsed time of 10 days, 19 hours, 20 minutes and 50 seconds. The first two KSC landing opportunities on Sunday were waved off because of weather concerns. The 87th Space Shuttle mission was the 40th landing of the Shuttle at KSC. On Sunday evening, the Space Shuttle program reached a milestone: The total flight time of the Shuttle passed the two_year mark. STS86 was the seventh of nine planned dockings of the Space Shuttle with the Russian Space Station Mir. STS_86 Mission Specialist David A. Wolf replaced NASA astronaut and Mir 24 crew member C. Michael Foale, who has been on the Mir since mid_May. Foale returned to Earth on Atlantis with the remainder of the STS_86 crew. The other crew members are Commander James D. Wetherbee, Pilot Michael J. Bloomfield, and Mission Specialists Wendy B. Lawrence, Scott E. Parazynski, Vladimir Georgievich Titov of the Russian Space Agency, and Jean_Loup J.M. Chretien of the French Space Agency, CNES. Wolf is scheduled to remain on the Mir until the STS_89 Shuttle mission in January. Besides the docking and crew exchange, STS_86 included the transfer of more than three_and_a_half tons of science/logistical equipment and supplies between the two orbiting spacecraft. Parazynski and Titov also conducted a spacewalk while Atlantis and the Mir were docked

Stock Photo: 10/06/1997 -- The orbiter drag chute deploys after the Space Shuttle orbiter Atlantis lands on Runway 15 of the KSC Shuttle Landing Facility SLF at the.

Searchable keywords

Choose multiple keywords