Stock Photo - 11 June 2018, Germany, Stralsund: Engineers check the Ruegen Bridge with a lifting platform (R). Temporarily, one direction of the 2,8-kilometres-long mainland connection between Stralsund and the Baltic Sea island Ruegen will be closed off every day from 7 until 19.30 until 14 June 2018 for the great bridge check-up. The traffic will be re-directed along the road L 296, the old Ruegen dam. Specialised inspectors of construction check the bridge deck and the pillars in the course of the main examination. This extensive bridge examination according to DIN 1076 (German Institute for Standardization) is necessary every six years for the guarantee of the serviceability, structural stability and traffic safety. Photo: Stefan Sauer/dpa-Zentralbild/dpa. - Stralsund/Mecklenburg-Western Pomerania/Germany

Stock Photo: 11 June 2018, Germany, Stralsund: Engineers check the Ruegen Bridge with a lifting platform (R). Temporarily, one direction of the 2.

Searchable keywords

Choose multiple keywords